2011-09-06 Statusmeeting

Agenda for the joint BNF, ONB, SB and KB NetarchiveSuite tele-conference September the 6th 2011, 13:00-14:00.

Practical information

  • Skype-conference
    • Mikis will establish the skype-conference at 13:00 (Please do not connect yourself):
      • BNF skype name: sara.aubry.bnf
      • ONB skype name:
      • SB skype name: mss.statsbiblioteket.dk
      • KB skype name: christen.hedegaard.kb
    • TDC tele-conference (If it fails to establish a skype tele-conference):
      • Dial in number (+45) 70 26 50 45
      • Dial in code 9064479#
  • BridgIT:
    • BridgeIT conference will be available about 5 min. before start of meeting. The Bridgit url is konf01.statsbiblioteket.dk. The Bridgit password is sbview.

Participants

  • BNF: Nicolas, Sara and Clément
  • ONB: Michaela and Andreas
  • KB: Tue, Søren and Jonas
  • SB: Colin and Mikis

Accept of the agenda and accept of the minutes from the last meeting (Mikis)

Netarchivesuite workshop at BNF in December

  • Status for agenda.

    Mikis will ask the DK curator for input to the workshop agenda

  • Proposal: 17-18 November or 24 & 25 November 2011

    Mikis will collect input for finding a date which suites the most. See Date for workshop

3.17.0 release 

  • Status
    • Sara will have a look at the missing French translation. Mikis will send a mail with specifics.
    • Andreas will add verification steps to NAS-1895

Iteration 49 (3.18 Production release) (Mikis)

  • The plan.
    Status.
  • Load

    We will postpone the release to the 1.november, because of the delayed 3.17 release. Only SB/KB will be contributing to this iteration.

Status of the production sites

  • Netarchive.dk (Tue): Step 2 broadcrawl is running.
  • BNF (Sara): Currently testing 3.16.1 for a domain crawl (but still in the deduplication stage), Production use of 3.16.1 for selective crawls (daily news, videos, monthly crawls).

    BnF are currently starting to harvest Youtube like videos, which is very interesting from a NAS point of view as improved Rich Media harvesting is on the project prioritexed list. Sara will try to digup information regarding the BnF setup. We'll also include some time in the november workshop to discuss this area

  • ONB (Michaela):  Currently running domain crawl stage 1, started 1st of August with NAS 3.16.1 on 8 machines and 20 low harvest instances.

Date for next joint tele-conference.

Any other business

Michaela asked for the status of Bnfs and SB/KB delivery of CDX files to the Memento project. Mikis will ask Bjarne to send information regarding this.

Error rendering macro 'gadget' : The gadget at https://sbforge.org/jira/rest/gadgets/1.0/g/com.pyxis.greenhopper.jira:greenhopper-gadget-hour-burndown-chart/gadgets/greenhopper-hour-burndown-chart.xml was not added to this Confluence instance yet.