Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Panel
  • We switched to NAS 5.2 already because we had severe problems with https websites with the former version. These problems are fixed now by using H3 which runs under java 1.8.0_77 and following disabled jdk.tls Algorithms in /opt/jdk1.8.0_77/jre/lib/security/java.security

    jdk.tls.disabledAlgorithms=SSLv3, DHE, ECDHE, RC4, MD5withRSA, DH keySize < 768

    It went smooth so far. We are still using the arc format, because we have to refactor all our tools before we switch to warc.
  • The crawl about our presidential elections still running, we have a new election date beginning of December and hope to be able to finish the crawl soon.
  • Apart from one small, additional thematic crawl we will only have ongoing crawls until the end of the year. Next domain crawl is scheduled for 2017.

BNE

Panel
 
  • Our General Elections crawl is still running. We hope we can close it by the end of the week, in case the Prime Minister is voted by the Parliament. For this last week, the crawl is running daily, with collaboration of regional web curators that have been adding, reviewing and doing quality assurance of the collection of seeds.
  • Our main tasks by now are related to the working meeting we are preparing with the regional web curators, here at the Library, on November 7th.
    • We have scheduled a short workshop for BCWeb, that web curators are using in a preproduction environment so far. But they are already building their own web collections using CWeb.
    • We are working also in a safe access to our web collections (and the non-print legal deposit in general) using Remote Desktop, for the Regional Libraries to remotely access to the non-print legal deposit, including web archive and deposited publications.

KB/Sweden

Panel
 

Next meetings

...