- Status of task list for iteration 47
- Status of Iteration 47 Release Test
- Retrospective:
- What went well during the iteration?
Panel Nicolas contributed heavily to solving a number of database related problems as we discovered these in the release test.
- What could be improved in the next iteration?
Panel We need to have a better idea of the state of the system earlier in the iterations, so the release test doesn't stop the first time we stress the system. The introduction of continuous system test, where stress and load test might be included. Scaling up the tests systems at the different test sites might also be relevant to simulate production loads/performance.
Status of the production sites
...
Status of project migration to the SBForge platform (Mikis)
- SBForge.org
Panel - All GForge stuff migrated.
- Wiki migration will start as part of I48
- Maven migration is hindered by cyclic depedencies in the current modules testcode.
- Curator mailing list moved to SBForge.
...
Panel |
---|
|
...
Date for next joint tele-conference.
...